MOUNTING & PLACEMENT
This equipment can be either wall or bench mounted
CHECK FOR THE FOLLOWING SERVICES:
Single phase electric supply capable of handling a load of 3 KW, 230V±10%, 50-60 cycles and with a fuse carrier of 15 amps.
- A Conventional 15 amps plug and socket, wall mounted is recommended.
- The equipment must be earthed in all cases. Red-Live, Black-Netural & Yellow/Green earth.
- Cooling water supply for glass condenser (part no.4) capable of providing minium flow rate of 60 ltrs/hr. The flow rate has to be adjusted by the Lab technician using a measuring cylinder or using a flow meter.
- A drain located below the level of the still so that the PVC drain pipe (part no.7) from the glass boiler (part no. 5) can fall straight without kinks or bends to allow unimpeded flow of ater.
- Space for distillate Collection reservoir to be located below the still.